Tieri Solar

Tieri Solar

Contract Name:

LILYVALE SOLAR FARM, TIERI

Client:

ACCIONA INDUSTRIAL/GRANSOLAR (GRS)/JOHN BEEVER

Contract Value:

$9,500,000

Project Duration:

12 months (2017 – 2018)

Project Brief:

The construction of a solar photovoltaic power plant – “Lilyvale Solar Farm”, approximately 110MW, covering 387 hectares.

Whitehouse Group was responsible for the following works:

  • Clear and grubbing of site
  • Constructing intersection to site
  • 7km unsealed access road
  • 12km of internal unsealed access roads
  • Construct table drains and concrete floodways
  • Installation of concrete floodways and stormwater pipes
  • Substation pad construction
  • Cut to fill for solar panels
  • Electrical trenches across site