Contract Name:
BLACKWATER AQUATIC CENTRE, BLACKWATER
Client:
HUTCHINSON BUILDERS/CENTRAL HIGHLANDS REGIONAL COUNCIL
Contract Value:
$500,000
Project Duration:
10 months (2016 – 2017)
Project Brief:
The construction of the Blackwater Aquatic Centre. The Blackwater Aquatic Centre consists of a 55-space car park; 10-lane, 50 metre pool; 6-lane, 25 metre pool; splash pad; amenities buildings and green areas.
Whitehouse Group was responsible for the following works:
Main site:
- Clear and grubbing
- Stripping of all topsoil
- Cut to fill
Carpark:
- Clear and grubbing
- Stripping of all topsoil
- Cut to fill
- Pavement
- Supply of asphalt
- Kerbing
- Road infrastructure
- Pipes and headwalls
- Bio basin