Project Name:
MIA North and South Apron Upgrade
Project Value:
2.5 million
Time Frame
4 months
Scope of works
- Excavation and of pavement, import quarry material, lay and compact to the line’s levels shown within the project drawings.
- Complete construction of concrete spoon drain on the Northern apron, including supply of all materials.
- Construction of open drains and rock chutes on the Southern apron, including the supply of rock chute materials.
- The supply and installation of light vehicle access (built all weather), RCP pipes and headwalls.
- Maintain dump areas.
- Supply of all testing and survey requirements.
- Certification of all construction Work.