Project Name:

MIA North and South Apron Upgrade

Project Value:

2.5 million

Time Frame

4 months

Scope of works

  • Excavation and of pavement, import quarry material, lay and compact to the line’s levels shown within the project drawings.
  • Complete construction of concrete spoon drain on the Northern apron, including supply of all materials.
  • Construction of open drains and rock chutes on the Southern apron, including the supply of rock chute materials.
  • The supply and installation of light vehicle access (built all weather), RCP pipes and headwalls.
  • Maintain dump areas.
  • Supply of all testing and survey requirements.
  • Certification of all construction Work.