Scope of works

  • Excavation and construction of the dam compound along with clay capping existing subgrade;
  • Site preparation including waste removal and ground preparation as required;
  • Supply and construction of culverts and open drainage;
  • Import, lay and compact quarry material for LV and HV roads;
  • Rock protection;
  • Spreading and amelioration of topsoil, hydromulch and seeding.
  • Certification of all construction Work.