Contract Name:
LILYVALE SOLAR FARM, TIERI
Client:
ACCIONA INDUSTRIAL/GRANSOLAR (GRS)/JOHN BEEVER
Contract Value:
$9,500,000
Project Duration:
12 months (2017 – 2018)
Project Brief:
The construction of a solar photovoltaic power plant – “Lilyvale Solar Farm”, approximately 110MW, covering 387 hectares.
Whitehouse Group was responsible for the following works:
- Clear and grubbing of site
- Constructing intersection to site
- 7km unsealed access road
- 12km of internal unsealed access roads
- Construct table drains and concrete floodways
- Installation of concrete floodways and stormwater pipes
- Substation pad construction
- Cut to fill for solar panels
- Electrical trenches across site